Burton C of E Primary School Toilet Refurbishment Case Study

Burton C of E Primary School Toilet Refurbishment

Burton C of E Primary School Image Gallery

Burton C of E Primary School - Toilet Cubicle Burton C of E Primary School - Toilet Roll Dispenser Burton C of E Primary School - Non-Concussive Taps Burton C of E Primary School - Wash Trough Burton C of E Primary School - Overview Burton C of E Primary School - Blow Down Hand-Dryer

Burton Church of England Primary School, a co-educational institution in Dorset, South West England, approached us to undertake a full refurbishment of four Student Washrooms that reflected the School’s unique identity.

To enhance privacy and align with the school’s colours, we installed Stature Full-Height Cubicles in Polyrey Swatches Zeste de Citron (Z016) and Vert Impérial (V110). To improve handwashing efficiency, we fitted 1800mm Wash Troughs with integrated Vanity Units, allowing multiple students to wash their hands simultaneously.
 
Safety was a top priority; Thermostatic Mixing Valves (TMVs) were installed to ensure a safe water temperature, reducing the risk of scalding. To further support sustainability and functionality, we used Inta Non-Concussive Taps to prevent water waste and fitted robust, Counter-Mounted Soap Dispensers.
 
The school opted for our school toilet design and refurbishment service. This project delivered modern, vibrant, and safe washroom facilities that support both students' well-being and the school's values.
Related Products