Case Studies

King Arthur’s School Case Study

King Arthur’s School Case Study

We were contacted by King Arthur’s School in Wincanton, Somerset to redevelop four student washrooms. As well as being very outdated and in poor condition, the washrooms had received several small remedial works over the years, resulting in a washroom that was full of surface mounted services like pipework and electrical conduit.

Read more
Case study: Crystal Palace Football Club

Case study: Crystal Palace Football Club

South London’s Crystal Palace Football Club approached us to handle the renovation of their first team home and away dressing rooms.

Read more
Horsely Camping and Caravanning Club - Case Study

Horsely Camping and Caravanning Club - Case Study

Following a busy summer season, Horsely Camping and Caravanning Club got in touch to discuss the overhaul of their reception and amenity buildings. The existing facilities were somewhat tired and became a point raised in online reviews of the site.

Read more
Brittany Ferries - Case Study

Brittany Ferries - Case Study

We were approached by Brittany Ferries to provide the specification and refurbishment of their busy commercial driver washrooms at their port in Poole.

Read more
Grass Valley - Case Study

Grass Valley - Case Study

With around 40 washrooms to renovate, Berkshire’s Grass Valley approached us to map out a phased process of work to upgrade and refurbish its male, female and disabled washrooms as well as changing rooms and showering areas.

Read more
DSI Foods - Case Study

DSI Foods - Case Study

DSI Foods approached us to implement new washroom and changing facilities in three main areas, with the goal of maintaining high levels of hygiene at the heart of the project.

Read more
Global Charity's London HQ Renovation - Case Study

Global Charity's London HQ Renovation - Case Study

We were contacted by a large international charity to overhaul all the washroom facilities in its central London HQ. With 11 washrooms over four floors and no space for skips, a meticulous phased plan of works was required.

Read more
Gravesend Grammar School - Case Study

Gravesend Grammar School - Case Study

This busy secondary Grammar school in Gravesend approached Commercial Washrooms to take care of some tired toilet facilities. After an initial consultation, we drew a specification with the client that would offer a clean, modern aesthetic with high durability credentials and an easy clean design.

Read more
Charlton House

Charlton House - Case Study

Charlton House is a Jacobien manor house open to the Public for viewing, and also carries out wedding ceremonies and other corporate/conference functions. 

Charlton House undertook a refurbishment of 2 toilet rooms to create modern, clean, and sophisticated facilities which are in keeping with the period features of the 16th-century house and the expectations of the venue's visitors and curators. 

Read more
Hampton Court Palace

Hampton Court Palace - Case Study

Hamtpon Court Palace commissioned the refurbishment of its Wilderness toilet facilities situated within the grounds of the Palace.  The project included the refurbishment of the ladies, gents, and disabled toilet rooms and was intended to improve the quality of facilities for its visitors.  

Read more
Page
Show per page