Muswell Hill Golf Club, London - Case Study

Muswell Hill Golf Club, London - Case Study

Muswell Hill Golf Club is one of north London’s finest golf clubs and recently made the decision to completely update and refresh their member’s shower and washrooms.

Following a full design, specification, CAD drawing and 3D visual service, the golf club proceeded with an impressive mix of modern features, while still maintaining the heritage and high-end feel of the property.

Attention to the Details

Dorset Wooliscroft quarry floor tiles were installed, which are approved for non-slip use. Meanwhile, the walls were covered in a porcelain tile in graphite grey. This was contrasted with Solid Grade Laminate toilet cubicles and duct sets that carried a walnut veneer finish. Solid Grade Laminate is a highly regarded material in commercial washroom environments due to it being incredibly hard-wearing and being completely impervious to water. Stainless steel hardware was used on all cubicles including locks, hinges, feet and headrails.

Sensor-activated flush kits were installed alongside Armitage Shanks sanitary ware. Sandringham back-to-wall toilets were used alongside Torrent flush kits, while the Sanura HygenIQ urinals were partnered with the DVS Flushmatic flush control.

Sensor-activation was also utilised with the Biodrier Lite hand dryer, as well as a PIR lighting system that activates lights only when a user is actually in the washroom, helping to keep energy usage and costs down.

Instead of a series of shower trays, Aco gulley drains were fitted as part of a wetroom environment where RADA V10 shower packs were installed, allowing users to have full control over water flow and temperature.

Function & Form: Moulded Basins

A Solid Surface countertop was installed in the hand wash area, which featured Corian moulded washbasins and minimalistic lever taps. A large-format mirror was fitted above this wash area alongside Dolphin wall mounted soap dispensers. 

A vanity room adjoined the female wash space and was fitted out with another large format mirror that sits above a Solid Surface countertop with integrated hair dryers. A bespoke wardrobe was also fitted in this room to enable members to store eveningwear and have it on hand when exiting the showers.

From design and specification, through to the complete supply of materials, Muswell Hill Golf Club benefited from only needing to deal with one supplier for the entirety of the project, which was carried out on a budget in approximately six weeks. 

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Muswell Hill Golf Club | Washroom Refurbishment | Commercial Washrooms

Featured Products

More to explore in Washroom Case Studies

  1. Aspire National Training Centre Changing and Shower Facilities - Case Study

    Aspire National Training Centre Changing and Shower Facilities - Case Study

  2. Cambridge University, Wolfson College - Case Study

    Cambridge University, Wolfson College - Case Study

  3. Ernest Bevin College - Case Study

    Ernest Bevin College - Case Study